The present work is a case study contributing to the major planning project “Suedlink”. It is structured as follows: first, in a theoretical part, mandatory theories of social acceptance (Wüstenhagen et al., 2007), steps of participation (Münnich, 2014), and the governance theory (Benz and Dose, 2011) are elaborated. Secondly, the relevant methods are discussed. Thirdly, in a qualitative analytical part, the information that were gathered from the expert interviews are analyzed with the use of the aforementioned theories. In the fourth place, an empirical quantitative analysis of data regarding the public acceptance towards Suedlink is presented.
In this case study, with the use of qualitative and quantitative methods, two questions are answered: first, which governance aspects were relevant for the priority use of underground cables for the construction of high voltage direct current transmission lines? For this question, intensive document analysis and different expert interviews were conducted. Secondly, the central question of the present work addresses the question whether local or/and individual factors affect the public acceptance towards SüdLink. Here, in particular, it is interesting to analyze if the priority use of underground cables affected the people’s acceptance towards SuedLink. In order to respond to both questions, an online survey was conducted among citizen initiatives, district administrators, and individuals in social media during March till July 2016. Thereafter, the data was analyzed with the use of descriptive quantitative methods. The data shows, that underground cables not necessarily increase public acceptance (see also Menges and Beyer, 2013). On the contrary, individual and local criteria were relevant for the survey respondents. For example criteria such as the quality of participation, distance between home and transmission lines, and the additional financial burden (taxes, higher prices for electricity) were important for the evaluation. In addition, survey respondents who participated in citizen initiatives were more critical against the priority use of underground cables and SuedLink in general. Likewise, residential homeowners rejected every form of transmission lines.